To Shiny Rails

PB&J Railroad Reconstruction Begins

by on Aug.02, 2014, under PBJRR

140802-6502There have been lots of changes along the PB&J right-of-way over the past year or so. The largest change is the back yard. The entire back yard has been taken over by a deck (see the photos of Lynn’s retirement party). The other major occurence was the removal of the large oak tree that was right in the middle of Fosterville. This necessitated the removal of the entire railroad. So, we’re pretty much starting over. When Papa Bill got started a couple weeks ago, there was NOTHING but a few concrete bridge supports and the wall around the mission area. Everything had been take out to raw ground. Some other changes to note… A new puppy, Sandy, a labradoodle, brought a dog run to the driveway. The run is directly behind the bench. That actually opened up the area nicely. The hot tub is gone from the concrete area lower right. This’ll be a new seating area. Note how the two bridges will soon lead to a 30-degree crossover/diamond in the foreground. There will be a balloon track on the rock patio that connects one side of the diamond to the other making the basic layout a circle eight.

More photos: http://jf2.com/pbjrr/140802.html


Comments are closed.

Looking for something?

Use the form below to search the site:

Still not finding what you're looking for? Drop a comment on a post or contact us so we can take care of it!

Copyright © 2009-Present, Jamie Foster