To Shiny Rails

Fosterville is Taking Shape on the PB&JRR

by on Jun.19, 2009, under PBJRR

By the end of Dad’s last visit, Fosterville was practically complete, the railhead was halfway through the tunnel to the backyard, and a mining operation was going in on a nearby mountainside.

090619-348 090619-362

The page is here: http://www.jf2.com/pbjrr/090619.html


Comments are closed.

Looking for something?

Use the form below to search the site:

Still not finding what you're looking for? Drop a comment on a post or contact us so we can take care of it!

Copyright © 2009-Present, Jamie Foster